Laserfiche WebLink
Climax Mine <br />• Climax Mine <br />- August 5, 1993 -Meeting between DMG and Cyprus. <br />• » Review Preliminary Ground Water Monitoring Plan (Permit No. M 77- <br />493). <br />• Tenmile Drainage <br />- Monitoring of two ground water monitoring wells since 1987. <br />- No impacts to the ground water. <br />• Eagle River Valley <br />- No ground water present below No. 4 Dam. <br />- No ground water impacts to the Eagle Basin. <br />» No.4 Dam cut-off wall. <br />» Bedrock low permeability. <br />- Voluntary Installation of well between Robinson Lake and No. 4 Dam. <br />• Arkansas River Drainage <br />- No need for ground water monitoring in the Arkansas basin based on <br />current activity. <br />- Baseline monitoring well located at property boundary. <br />• Preliminary Ground Water Monitoring Plan <br />. - Characterization of ambient ground water quality by the end of 1st quarter <br />,, ~ 1995. <br />