Laserfiche WebLink
Hanr~c~renn 11~i11 <br />• Henderson Mill <br />-July 12, 1993 -Meeting between DMG and Cyprus. <br />Review of Preliminary Ground Water Monitoring Plan. <br />• Lack Of Potential Use For Ground Water <br />• Ground Water Flow Controlled By Bedrock <br />• No Constituent Loading To Surface Water Across The Site <br />• Preliminary Ground Water Monitoring Plan <br />- Ambient ground water quality could not be determined by September 1, <br />1993. <br />- Installation of monitoring well and sampled quarterly for five periods. <br />- Characterization of ambient ground water quality by the end of 1st quarter <br />1995. <br />• Items To Be Documented: <br />- Depth to Precambrian bedrock on north side. <br />- Document direction of ground water flow. <br />- Determine ground water velocity (if feasible). <br />~~ <br />