Laserfiche WebLink
Colorado vision of Minerals and G~ogy <br />ESTIMATING FORM - SCRAPER WORK <br />------------------------------ <br />------------------------------ <br />TASK NO. 3 PREP. BY: RCO PERMIT NO. M-93-080 <br />"""""""""" """""""" """""""" <br />DATE 03/08/94 FILENAME: M080-3 OPERATION: Calhan Clsy Pit <br />PERMIT ACTION Reclamation <br />TASK DESCRIPTION Spread overburden on pit floor, 4.5 acre <br />"""""""""""""""""""""""""""""""""""""""""""""""""""" <br />HOURLY EQUIPMENT COSTS: <br />Single, Double or Triple <br />County: EL PASO Labor Zone 1 Shifts S <br />""""""""""" """""""" """""""""" <br />Equipment Descriptions <br />Scraper team make-up :CAT 623E with ROPS cab <br />Road maint. - Grader :N/A <br />- Water T. :N /A <br />Scraper Team Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equipment Filename:623E-ROP N/A N/A <br />Utilization on job: 100% <br />"""""""" N/A <br />"""""""" N/A <br />"""""""" N/A <br />" """"""""" <br />Cost Breakdown: <br />Ownership cost/hr: $43.83 N/A N/A N/A <br />Operating cost/hr: $58.08 N/A NJA NJA <br />' Operator cost/hr: $20.56 N/A N/A N/A <br />- <br />-------- <br />Unit subtotals: $122.47 -------- <br />N/A -------- <br />N/A - -------- <br />N/A <br />Scraper team subtotal $122.47 <br />""""""""" Maint. subtotal N/A <br />""""""""" <br />Total Work Team Cost/Hr: $122.47 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 7200 CCY <br />Cu.Yd. '"'"""" "" Swell Loose <br />Volume: 7,200 CCY Factor: 1.125 Volume: 8,100 LCY <br />"""""""""" """""""""" """"""""""""" <br />Source of quantity take-off:Calc from mining/recl plans <br />Source of est. swell factor:program <br />