Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd <br /> <br />sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.; Task Description Cost ($) <br />Subtotal (H): <br />I. EARTHWORK - SEDIMENT POND/DIVERSION DITCH/CHECK DAM REMOVAL <br />Task No.; Task Description Cost ($) <br />. <br />. <br />. <br />. . <br />. <br />. <br />. <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.; Task Description Cost ($) <br />.,...,,,,,,....,,.,...,.~..,.~,,..,...~,,,.ti„~,.~,,,.,,,.~,,.~.,,...,,,.~,.,.~,.~~~.,.,.,.,.,...,,, .,,.,,..,.,,_,.,,,.~ <br />4 Spreading topsoil on 3:1 slope, 0.5 acre $533 <br />5 Spreading topsoil on pit floor, 4.5 acres $1,503 <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. . <br />Subtotal (J):_-_--$2,036- <br />