<br />RECLAMATION COST SUMMARY cont'd
<br />
<br />sheet 3 of 4
<br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION
<br />Task No.; Task Description Cost ($)
<br />Subtotal (H):
<br />I. EARTHWORK - SEDIMENT POND/DIVERSION DITCH/CHECK DAM REMOVAL
<br />Task No.; Task Description Cost ($)
<br />.
<br />.
<br />.
<br />. .
<br />.
<br />.
<br />.
<br />Subtotal (I):
<br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT
<br />Task No.; Task Description Cost ($)
<br />.,...,,,,,,....,,.,...,.~..,.~,,..,...~,,,.ti„~,.~,,,.,,,.~,,.~.,,...,,,.~,.,.~,.~~~.,.,.,.,.,...,,, .,,.,,..,.,,_,.,,,.~
<br />4 Spreading topsoil on 3:1 slope, 0.5 acre $533
<br />5 Spreading topsoil on pit floor, 4.5 acres $1,503
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />. .
<br />Subtotal (J):_-_--$2,036-
<br />
|