Laserfiche WebLink
Colorado vision of Minerals and Ge~gy <br />ESTIMATING FORM - SCRAPER WORK <br />------------------------------ <br />------------------------------ <br />TASK NO. 5 PREP. BY: RCO PERMIT NO. M-93-080 <br />DATE 03/08/94 FILENAME: M080-5 OPERATION: Calhan Clay Pit <br />PERMIT ACTION Reclamation <br />TASK DESCRIPTION Spread topsoil on pit floor, 4.5 acre <br />HOURLY EQUIPMENT COSTS: <br />Single, Double or Triple <br />County: EL PASO Labor Zone 1 Shifts S <br />Equipment Descriptions <br />Scraper team make-up :CAT 623E with ROPS cab <br />Road maint. - Grader :N/A <br />- Water T. :N/A <br />Scraper Team Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equipment Filename:623E-ROP N/A N/A <br />Utilization on job: 100X N/A N/A N/A <br />Cost Breakdown: <br />Ownership cost/hr: $43.83 N/A N/A N/A <br />Operating cost/hr: $58.08 N/A N/A N/A <br />Operator cost/hr: $20.56 N/A N/A <br />-- N/A <br />--- <br />---- <br />- <br />Unit subtotals: ------- <br />$122.47 -------- <br />N/A ---- <br />--- <br />N/A -- <br />N/A <br />Scraper team subtotal $122.47 Maint. subtotal N/A <br />Total Work Team CostJHr: $122.47 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 3600 CCY <br />Cu.Yd. ~" " "`~' Swell Loose <br />Volume: 3,600 CCY Factor: 1.115 Volume: 4,014 LCY <br />Source of quantity take-off:Calc from mining/reel plans <br />Source of est. swell factor:program <br />