Laserfiche WebLink
<br />FOIDEL CREEK P1INE <br />OS-O~S~G <br />REFUSE FIRE CONTROL PLAN <br />I.D. :'Jo. 1211-GO-09-0045 <br />On1-• authorized and trained personnel will be used in fire <br />fighting procedures in the refuse pile. (Authorized <br />personnel are those who are designated by the operator and <br />trained in firE fighting procedures.) <br />Training on these procedures will be a part of surface mobile <br />equipment operator task training. Training will include: <br />methods of fire fighting. MSHA Standards concerning fire <br />fighting, Company policy and procedures, hands-on use of <br />SCSR's, and the proper usE of CO monitoring devices. <br />THE methods used to control and extinguish the fire c:ili Se <br />• evaluated be the operator and c:i11 vary with the type and <br />sizE of the firE. Tli2c may include: compaction, spreading, <br />direct attack by Eitlier water or foam. or a combination of <br />a~iy or all of these metiiods. <br />khen machinery is used as a part of the fire fighting <br />procedure, the following items will be done: <br />1. The machinery will be cleaned and checkEd for oil <br />leaks. <br />2. Operatrrs will ~=ontinuall;r mGnltur fol CO ~: i1. i, i <br />CO^_°0 or similar sEnsor. <br />~. Operators will SE Sriefed on fire fighting <br />prOCEdUIES fJl' 2sCli piece of machinery usEd. <br />4. Operators c:ill maintain good visibility chile <br />PUShi:i~ !ii,t Cu.::l. <br />:f :srC:,~'~.in:, i:vt .-..-ia: 15 done b;i %~ 1GRdEr, It [:11i <br />b2 ,iliT~i~2tJi from file bucket ds tfi2 loader 15 traminK <br />bacl.c:ards. <br />G. All e::its from *.IiE rab will SE operational. <br />• ~ • Ali mdClliliES wlii iidC'2 a f1rE 2::t1n~Ulsh21' on them. <br />;. ~iCSR will SE on Each niece of machinery whi1E in <br />use. <br />3. OpErators will bE in contact c:ith other personnel. <br />