Laserfiche WebLink
<br />-3- <br />~J <br />b) The Board will enter the lands to perform reclanation only if the Board has determined: <br />not been performed, and <br />that reclamation required bylaw to have been performed upon such lands has <br />ii. that permit revocation proceedings described in the Act or similar provisions <br />of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2 exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/~'3{X, b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LONG <br />Division Director <br />M.`ASSBDCI7'Et.'~MhP.1 W CB.ESC <br />