Laserfiche WebLink
EXHIBIT M <br />OTHER PERMITS AND LICENSES REQUIRED <br />1. An Air Pollution permit will be applied for prior to com- <br />mencement of operations. <br />2. A Use by Special Review permit from Grand has been obtained. <br />3. This is a open pit operation and ground water will not be ex- <br />posed so a well permit and temporary supply plan is unneces- <br />sary. <br />4. A dredge fill permit (404) is not required at this time <br />because waters of the U.S. will not be impacted. If wetland <br />areas are mined we will obtain the necessary permit. <br />5. A Storm Water Management Plan (SWMP) may be necessary for <br />this pit if there is discharge from the mined area. <br />6. A NPDES permit to dewatering will be obtained prior any <br />discharge of water from the site. <br />32 <br />