Laserfiche WebLink
<br />I~~ I~~II~I~~IIII I~~ <br />QUARTERLY POND INSPECTION REPORT <br /> PAGE 1 OF 2 <br />OPERATOR: MINREC, INC. QUARTER: THIRD QUARTER 1995 <br />MINES: NORTH THOMPSON CREEK DATE OF INSPECTION: September 30, 1995 <br />POND IDENTIFICATION P-3 P-5 P-9 REFUSE <br />TYPE OF POND SEDIMENT DETENTION SEDIMENT SEDIMENT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL RECLAIMED RECLAIMED 24" 6" <br />SED (% total storage) Oct. 1994 Oct. 1994 0~ OK <br />OUTFLOW (cfs) NONE NONE <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO REFER TO DWGS: D-4-7 & D-4-8 FOR POND <br /> LOCATIONS <br /> <br />Rills & Gulleys X <br />Inadequate Vegetation X <br />Outlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />other x <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: The water level in P-9 was about 24" below its outlet <br />The refuse pond had about 6" of water in it. <br />MAINTENANCE REQUIRED: Non e <br />SWMP CONTROLS: The stormw ater management plan controls were not inspected. <br /> .~2i <br /> L ~ Q'J <br />~' <br />;~I24~ <br />NAME OF INSPECTOR: Jim Stover, P.E. 19230 ' <br />