My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48881
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:48 PM
Creation date
11/20/2007 1:48:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033A
IBM Index Class Name
Permit File
Doc Date
11/14/2003
Section_Exhibit Name
Rule 2.04 Environmental Resources
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Quality Control On Well Samoling And Analysis <br />All water samples are taken by employees or agents of the Operator <br />using proper sampling procedures. Before obtaining a sample from <br />the alluvial wells, three well volummes will be removed or the well <br />will be completely evacuated and the recharge will be sampled. No <br />filtering system is available on site, therefore, the samples are <br />filtered at the testing laboratory. Samples will be packed in ice <br />and sent to the laboratory within one day of sampling. <br />Equipment utilized to take field measurements are calibrated on the <br />day of sampling prior to each sampling event. <br />Figure 2H, Laboratory Quality Assurance Program, gives a brief <br />summary of ACZ INC's Quality Control Program utilized for analysis <br />of the samples. <br />LJ <br />• 2.04-30v Rev. 03-04-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.