My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48867
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:48 PM
Creation date
11/20/2007 1:48:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
APPENDIX A-FIGURES
Section_Exhibit Name
EXHIBIT 20 RDA POND DESIGN PART 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REVISED SPECIFICATION <br />Emergency Spillway <br />Grouted Gabions. <br />Materials -Gabion baskets to be used in the emergency spillway will meet the <br />requirements of the enclosed "Galvanized Gabion Specification" as <br />manufactured by the Maccaferri Gabions Company or equivalent. <br />Ready mixed concrete used in conjunction with the Gabion baskets must meet <br />the following specifications: <br />Cement: Portland Cement Type IA should be mixed in the following <br />portions: Air-entrained 400 LB cement and 100 LB fly ash per cubic yard <br />or 475 LB cement per cubic yard. <br />• <br />Water: A normal range water reducer shall be added to the water. <br />Aggregate: 3/8 inch maximum size peat gravel, ASTM size 8, should be <br />used. <br />Air Content: The air content should be between 6-996. <br />Slump: A 6 inch to 9 inch slump shall be maintained. <br />Execution - Gabion baskets shall be placed according to the enclosed <br />"Galvanized Gabion Specification". <br />Ready mix concrete shall be poured on the top of the rock filled gabion <br />baskets when all baskets are at the 2/3 full mark (i.e. a 1 foot thick basket <br />shall have 8 inches of rock in it). After the pour, the remaining rock will be <br />placed and the baskets sealed. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.