My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48862
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48862
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:47 PM
Creation date
11/20/2007 1:48:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003073
IBM Index Class Name
Permit File
Doc Date
3/17/2004
Doc Name
Appl Approval and Cost Est
From
DMG
To
Moffat Limestone Co. Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 04a <br />Date : 03/162004 <br />User: SSS <br />State :Colorado <br />County :Moffat <br />Site :Juniper Mountain Gravel <br />Agency or organization name :DMG <br />Permit or other jab action :new 112c <br />Task description :Grade re <br />HOURLY EQUIPMENT COST <br />overburden and <br />Permif(ob# : M-2003-073 <br />Abbreviation :none <br />Filename :M073-04a <br />when <br />Basic machine : Cat D8R Sedes ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank dpoer <br />Cost Breakdown : Ownership cosUhour <br />Operating cosOhour <br />Ripper op. wsUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization <br />Loose <br />NA volume : 7,500 LCY <br />$49.85 NA <br />$33.22 50 <br />$0.00 0 <br />$31.83 NA <br />$114.90 Total fleet costthour <br />Source of estimated volume :Assume 1/4 of material moved during shaping <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Corcection Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % ({ <br />Average site altitude : 6,200 feet <br />Material weight : 2,500 Ibs/LCY <br />Weight description <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.92 <br />Blade type : 1.00 <br />Net corcection : 0.48 <br />Adjusted unit production : 673.25 LCY/hr <br />Adjusted fleet production : 673.25 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 11.14 Hours <br />Unit cost : $0.171 /LCY Total job cost : $1,280 <br />Horsepower: 310 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />$114.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.