Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />E~~A <br />S Coal Company <br />OCT 13 1995 <br />Division of Minerals & Geology <br />Mr. Daniel Hernandez <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Com <br />October 10, 1995 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond inspection <br />Dear Mr. Hernandez: <br />Enclosed are copies of the third quarter Stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for Stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these Stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The 'as-built' certifications will be submitted as <br />soon as possible once they are finished. <br />Maintenance work on several of the Stockponds has been completed <br />during the third quarter and will continue during the fourth <br />quarter as weather conditions allow. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />n <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />