Laserfiche WebLink
i <br />Western Fuels-Utah, Inc. Deserado Mine <br />Date of Inspection: Iz/ob/94-12107/94 Inspector: Tim Chervick -- Environmental Coordinator <br />O erational Status <br />Gordon Bell -- Pro'ect En 'neer <br /> Type of Approx Sediment H2O Sa <br /># Ponds Name H2O Level % Level % qutflow Yes No Comments <br />1 Sed Ponds DP-1 80 Frozen 24 000 G.P.D. <br />2 RP-l 15 Frozen N.D. <br />3 RP-2 3 0 Frozen N.D. <br />4 RPM 0 Frozen N.D. <br />5 RR-1 0 Frozen N.D. <br />6 RR-2 0 Frozen N.D. <br />7 RR-3 0 Frozen N.D. <br />8 SS-1 5 80 N.D. Plan to clean out week of 12/12/94 <br />9 SS-2 0 2 N.D. <br />10 HSL-1 10 2 N.D. <br />1 l SDH-2U 100 5 .259 (\4PCD <br />12 SDH-2L 100 3 .2591viPCD <br />l3 SDH-3 80 5 N.D. <br />14 EP-1 0 5 N.D. <br />IS Sum RRS-1 0 5 N.D. <br />16 TS-1 0 5 N.D. <br />17 TS-2 0 IO N.D. <br />18 EP-2 0 5 N.D. <br />19 EP-3 0 2 N.D. <br />20 EP-1 0 2 N.D. <br />21 Proc Pond PP-1 80 20 N.D. <br />22 PP-2 70 5 N.D. <br />23 La oon AL-1 95 Unknown N.D. <br />Pond Descri lions <br /> <br /># Type of <br />Ponds <br />Name <br />Descri 'on <br />1 Sed Ponds DP-1 D-Portal <br />2 RP-1 Refuse Area 1 <br />3 RP-2 3 Refine Area 2/3 <br />4 RP-4 Refuse Area 4 <br />5 RR-1 Railroad Fill Slo Pond 1 <br />6 RR-2 Railroad Fill Slo Pond 2 <br />7 RR-3 Railroad Loo Pond <br />8 SS-1 Slot Stora a Buildin Access Road Pond <br />9 SS-2 Slot Stora a Buildin Emer en Coal Store a Area Pond <br />10 HSL-1 Halandras Sari 'Land Fill Pond <br />11 SDH-2U Down Hole S U r Influent Pond <br />12 SDH-2L Down Hole Sum Lower Etiluen[ Pond <br />13 SDH-3 Down Hole S Discluu' e 2 <br />14 EP-1 East Portal <br />15 S RRS-1 Railroad Sum 1 <br />16 TS-I Transfer Buildin I <br />17 TS-2 Transfer Buildin 2 <br />I8 EP-2 East down Pad <br />19 EP-3 Wesl down Pad <br />20 EPA Turnaround Pad <br />21 Proc Pond PP-1 Plant Proccess Pond <br />22 PP-2 Plant Process Pond <br />23 La oon AL-1 Alluvial Raw Water La oon <br />by Coal La6lTMC 1SDx~94 <br />