Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #5 <br />Inspection Period: Second Quarter 2003 <br />Inspection Date: June 6. 2003 <br />General Description or Reference to Site Plan: <br />«~~ ~~C~%~ v~~~~~ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />Excellent Moderate Few Poor <br />Extensive Some Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No <br />No <br />No <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes No <br />2). Is the inlet free of debris and restrictive material? Yes No <br />3). Is the discharge outlet free of restrictive material? Yes No <br />4). Is erosion occurring at the discharge outlet? Yes No <br /> Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />