Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: None ~7v Yi # <br />Inspection Period: Second Quarter 2003 <br />Inspection Date: June 6, 2003 <br />General Description or Reference to Site' Plan: n . /~ <br />~2GelUcS OI/LJ~.~/7?,(~ !1~/1~^'l U'^'" ~~~b-4~'-'." ""_ ~~cuf~ ~ICC~~WI'C'° <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate ew Poor <br />Extensive Some ew None <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />l/ <br />0 <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br /> <br />SEDIMENT STORAGE CAPACITY <br />t). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />~' <br />Date <br /> <br />m <br />~3 <br />Page 1 of 2 <br />