Laserfiche WebLink
.~ <br />~.. <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND IN.° .:CTION FORM <br />POnd NSW EISC NPDES NO. CONTAINt•II;NT I/5 <br />Date of Inspect <br />EMS ANRMENT <br />1. Adequacy o! the vegetative cover: E:~cellent, oderat , Few, Pods. <br />2. Erosion forming gullies: Extensive, Some, Very Few, More <br />3. is wave action causing erosion: <br />On the upstream embankment? Yea No ?~_• <br />• At the principal spillway inlet? Yea No ~ _ <br />4. Erosion of the downstream toe of the embankment? Yee No ~C <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yea No~,•_ If ye: <br />could this seepage cause potential instability? Yea No~_ <br />Explain: <br />~ <br />• :~ <br />~ <br />'' <br />::~ PR <br />1. INCIPAL SPILLNAY oar <br />Is the principal spil~wey5system in working order? Yae Mo <br /> 2. Ia the inlet free of debris and reatrictive~aiaterial?Yea~_Mo <br /> <br />C ~ 3. Is the .discharge outlet ~'iee of restrictive material? Yes No_ _ <br /> 4. Is erosion occurring at'`f}isidischarge outlet? Yes Mo ii <br /> yes, <br />' evaluate the severity: Extensive. Moderate Just starting Mo <br />:, <br />~~,~ EM ERGENCY SPILLMAY ~o,..i <br /> 1. Is the overall emergency spillway system capable o! passing <br /> design storm discharge? Yes No <br />'`; 2. Does it appear as if the emergancy'spillway has discharged water ~ <br /> since the last inspection? Yea No~_ <br /> 3. is eroaiori occurrin~at`nny section of the emergency spillway? <br /> Yes No Describe the ~ <br /> .extent <br />SEDIMEMR' STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />•~ Yes No _ I! yea, <br />'? explain: ~ <br />l:~_, Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. ~ <br />Inspector <br />