Laserfiche WebLink
~ •. BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION TORN <br />' NEW ELK <br />Pond t NPDES NO. CONTAINMENT 4 3 <br />3 <br />Date of Inspection ~~ 1 ~./S SS' <br />ElIB <br />1. AN1CAtENT _. <br />Adequacy of the vegetative cover: Excell+snt, Noderate,~~ Poo:' <br />2. Erosion forming gullies: Extensive, Sane, Very lew, None" <br />3. is wave nction cnusing erosion: <br /> On the upstream embankment? Yes No X <br />• At the principal spillway inlet? Yes NOT- <br />. 4. Erosion of the downstream toe of the embankment? Yee No~,_ <br /> The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dan7 Yes No ~ If ye: I', <br /> could this seepage cause potential instability? Yes No~_ <br /> Explain• <br />;~ PRIN CIPAL SPILLMAY <br />1. is the principnl spillway system in working order? Yes~_No <br />Y. Is the inlet free of debris and restrictive a:aterial?Yes~No <br /> <br />. ~.~ ! <br />//////TTTTTT~~~~ <br />( - 3. is the dischnrge outlet free of restrictive saterial? Yes~_No_ <br />4. Is erosion occurring at the discharge outlet? Yes No~_If <br />Yes. ~ <br /> ~ <br />evaluate the severity: Extensive. Noderste Just starting <br />•r <br />-;i EMERGENCY SPILLMAY ' <br />- 1. is the overall emergency sp~llway system capable of passing <br />design storm discharge? Yea No <br />2. Does it a ~°~ <br />ppear as i! the em~rgency'spillway has discharged water ~ <br />since the last inspection? Yea No ~ <br />3. Ia erosion occurring at day section o! the emergency spillway? <br />'. Yea No Describe the <br />.extent <br />SEDI![ENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir bean surpassed? <br />,.;i Yes No_~_ If yes, <br />`=' explain: ~ <br />( ~3~ . <br />`y~c•' Pleese add any special coaatenta concerning potentially dangerous <br />problems on the back of this ^heet. <br />Inspector ~~~ ~ .. <br />