Laserfiche WebLink
BASIN RESOURCES, INC. IIIIII{II~II~~IIIII <br />a•~• SEDIMENTATION POND INSPECTION FORM <br />Pond NEW ELK 004 <br />NPDES Mo. <br />~' Date of Inspection- _~~ ~ 3 , i55 ~ • <br />~. <br />1~Adequary o! the vegetative cover: Excellari ~Moderata, Few, Poo: <br />2. Erosion forainq gullies: Extensive, Soae, Very Taw, Moni- <br />7 <br />• 3. Is wave action causing erosion: <br />On the upstreav embankment? Yea No~_ <br />• At the principal spillway inlet? Yae Nom <br />4. Erosion of the downstream toe of the embankment? Yea No ~C <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee No ~C If yee <br />could this seepage cause potential instability? Yea No~^ <br />Explnin• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working orderT Yes~Mo <br />2. 1s the inlet free of debris and restrictive material?Yes_~Mo <br />C•-f•= 3. I^ the discharge outlet lree of restrictive material? Yes ~C Nom <br />4. Ia erosion occurring at the discharge outlet? Yes Mo vC If <br />yea, <br />evaluate the severity: Extensive Moderate Just starting lion <br />- EMERGENCY SPILLMAY ' <br />~~ 1. Ia the overall ensrgency spillway syatea capable of passing <br />design storm discharge? Yea_~No <br />2. Does it appear as if the amergenry'spillway has discharged water <br />since the lest inspection? Yes No_~ <br />3. Is erosion occurring at any section of the esergenry spillway? <br />" Yes Mo ' _ Describe the • <br />.extent <br />SEDIMENT STORAGE CAPACITY <br />1. .Has the design storage capacity of the reservoir been surpassed? <br />Yes No~,_ If yes, <br />explain• <br />~'~;; Please add any special.co:sants concerning potentially dangerous <br />problems on the back of this sheet. <br />lnspector u~^ <br />