Laserfiche WebLink
f <br />TRAFFIC PLAN <br />The County anticipates removing approximately 200,000 Tons of <br />material annually. The following basic parameters for the <br />operation project the traffic. <br />200,000 Tons/year <br />25 Tons/truck <br />200,000 _ 8000 Loads per year <br />25 <br />8 trucks on operation at 1 load per hour <br />10 Hours per day <br />8 X 10 = 80 Loads per day <br />8000 loads oer vear _ 100 days <br />100 loads per day <br />10 hours X 60 min = 1 Load every 7z min. <br />80 loads per day <br />