My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20791
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:39 PM
Creation date
11/20/2007 1:46:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
2/2/1985
Doc Name
#4 SEDIMENT POND CERTIFICATION
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />999 <br />Tti SEDI.IE ti'T eGnu ~Eic'~1r 11. r111ViV <br />On February 2, 1985, Larry M. Reschke, P.E., certified the <br />construction of the ~1 Sediment Pond. Mr. Reschke certified that <br />the pcr.d *.aas structurally sound and had the storage volume shown <br />on a drawing attached to his certification. During the 1990 mid- <br />term review for the Blue Ribbon Mine, it was noted that the S4 <br />Sediment Pond did not meet the requirements of Rule 4.05.6(11)(e) <br />& (h). <br />Rule 4.05.6(11)le) requires that the top of the settled em- <br />bankment be 1.0 foot above the water surface in the pond with the <br />emergency spillway flowing at design depth. <br />Rule 4.05.6(11)(h) requires that the minimum top width of <br />the embankment be no less than the quotient of (H+35)/5 where H, <br />in feet, is the height of the embankment as measured from the <br />upstream toe of the embankment. For the s4 pond, H = 5.1 feet, <br />so the minimum to width of the embankment shall not be less that <br />8.1 feet. <br />On August 14, 1991, maintenance work was performed on the <br />pond to bring it in to compliance with the above Ru_._. The pond <br />embankment was widened to a minimum top width of 9-feet. Fill <br />was placed on the top of the embankment so the top of the embank- <br />ment is at least one foot above the elevation of the top of the <br />emergency spillway. The volume of water storage in the pond was <br />not affected by this maintenance work. Some material was ex- <br />cavated from inside the pond so the sediment volume was increased <br />slightly. <br />I certify that the maintenance work performed on the ~4 <br />Sediment Pond was performed under my direct supervision and that <br />to the best of my knowledge and belief the pond is structurally <br />sound and the pond is now constructed in accordance with the <br />provisions of Rule 4.05.6. <br /> ~ <br />James E. ma~y,, • <br />,er ;~~lFeDate <br />P . E . 19 ?~0 .' ~ E STS' ;'PF'a <br /> ' <br />.' <br /> ' <br />c~ ~:~~ <br />? 930 <br /> ;~ <br /> <br />~ ~~ <br /> ~.c <br />., ~,' 'v 1 <br />,'' <br />V'~ <br /> yC ~ <br />' . <br />~~ <br />x <br /> ~ ~ " <br />,4.1: ;, <br /> ....~ i <br />
The URL can be used to link to this page
Your browser does not support the video tag.