Laserfiche WebLink
<br />PART I <br />Page 7 of 19 <br />• <br />E. SPECIAL REQUIREMF.tiTS (CONTINUED) <br />1. Materials Conta(nment Plan (Continued) <br />e. An implementation schedule for additlonal facilities which might be <br />required Sn (c) above, but vtilcl~ are not yet operat(onal; <br />f. A list of available outside contractors, agencies, or other bodies <br />which could be utilized in the event of a spill in order to clean <br />up its effects. IE [he facility is capable of handling spills <br />in-tiousc, this shall be documented Sn the plan; <br />g. Provision far yearly review and updating of the contingency plan, <br />plus resubmission of the plan to the Division Sf conditions and/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall in no way render inapplicable those <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />AmendmenCS of 1972, regulations promulgated thereunder, the Colorado <br />Na[er Quality Control Act, and regulations promulgated thereunder. <br />This plan should be prepared by a professional engineer registered in <br />the Slate of Colorado. <br />• Nothing here <br />to eaters of <br />apeclffcally <br />be construed <br />or criminal, <br />to contained aliall be construed ae allowing any discharge <br />the State other than through the discharge points <br />authorized in this permit. Nothing herein contained sh:~ll <br />as excusing any liability [he permictee might have, civil <br />for any spill. <br />The submittal of an Spill Prevention Control and Countermeasure Plan <br />(SPCC Plan) as required by 40 CFR Part 112 may sacisfy all or part of <br />this requirement. Sho~ild additlonal materials exist on site which are <br />noc addressed in the SPCC Plan, addressing those materials as per the <br />above will be required. <br />• Code: 1 - 21 Dale: 1 - 84 <br />