Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />OWL CANYON QUARRY FLOATING BOND <br />In the first five years of operation the total area disturbed at <br />any one time will be: <br />Major: Stripping and removal of limestone <br />area I,II,III,A,B and D 14.98 acres <br />Roads, stockpile and crushing area 18.0 acres <br />Moderate: Backfill in area I ~I 3.5 acres <br />Minor: <br />Total <br />Cost of Reclamation: <br />Backfilling - $483.00 <br />Grading & Contouring - 242.00 <br />Seeding & Revegetating- 66.00 <br />0 <br />36.48 acres <br />~/y1.00/acre <br />Major disturbance: <br />Stripping S removal of limestone <br />14.98 acres @ $791.00/acre = <br />Roads, stockpiles & crushing area <br />18.0 acres @ $308.00/acre = <br />$11,849.L8 <br />5 , 544. ~)0 <br />Moderate disturbance: <br />'~ area 1 3.5 acres @ $308.00 = 1,078.00 <br />$18,471. L8 <br />It is requested that a floating bond be required to cover reclamation <br />which can be reviewed and adjusted on a periodic basis. <br /> <br />~~~~;~; ~ ~ i9i3 <br />.'n. . •~~Cv' <br />`: ! . i~~ <br />