Laserfiche WebLink
• <br />RlcneM D. Lamm <br />6ovemor <br />DEPARTMENT OF NATURAL RESOURCES <br />David N. Gatctrea, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Dlroetor <br />May 16, 1985 <br />Mr. Dave Gossett <br />Energy Fuels Coal, Inc. <br />Three Park Central, Suite 900 <br />1515 Arapahoe <br />Denver, Colorado 80202 <br />Re: Technical Revision, Water Pump Powerline, Southfield Mine <br />File No. C-014-81 <br />Dear Mr. Gossett: <br />• The Division has reviewed your coal reclamation bond for $2,500 submitted on <br />May 6, 1985 and finds it acceptable. Therefore, the stipulation in the above <br />referenced technical revision has been satisfied. You may begin construction <br />of the water pump power line at this time. <br />If you have any questions please contact me. <br />Sincerely, <br />Gr~gui~ ~ <br />Reclamation Specia isl t <br />GRS/fw <br />cc: Mr. Roy Hughes Jr. <br />• <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />