My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48710
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:38 PM
Creation date
11/20/2007 1:45:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005067
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
110c Permit
From
Carrizo Stone LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARRIZO STONE SANDSTONE QUARRY <br />RECLAMATION COST <br />QTY. UNIT COST UNIT COST <br />1.Replace Overburden 3500 $0.58 LCY $2,030.00 <br />2.Vert. Highwall Reduction 0 0 LCY $0.00 <br />3. Grass Seed Mix(50% failure) 9.9 $163.25 ACRE $1,616.18 <br />4. Fertilizer-available N&P 9.9 $ 5.80 ACRE $ 57.42 <br />5. Topsoiling-Scraper&dozer 5600 $ 0.58 LCY $3,248.00 <br />25% swell <br />6.Scrifying Hard Pan Areas 9680 $0.04 SQYD $ 387.20 <br />7.Seedbed Prep & Planting 9.9 $130.00 ACRE $1,287,00 <br />8. Mulching Hay & Straw 9.9 $220.00 ACRE $2,178.00 <br />9. Weed Control 9.0 $ 35.00 ACRE $ 346.50 <br />IO.Mobilization&Demobilization 2 $750.00 EACH $1,500.00 <br />TOTAL DIRECT COST $12,650.30 <br />INDIILECT COST OVERHEAD AND PROFIT <br />Public Liability Insurance 1.55% $ 196.08 <br />Contractor Performance Bond Cost 1.55% $ 196.08 <br />Contractor Profit 10.00% $ 1,265.03 <br />DMG Project Administration Expense 5.00% $ 632.51 <br />TOTAL PERFORMANCE BOND AMOUNT $14,940.00 <br />Carrizo Stone Sandstone Quarry cost/acre $1,509.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.