Laserfiche WebLink
Michael D. Shimmin <br />April 18, 2006 <br />Page <br />bind the State Engineer to act in a similar manner in any other applications involving <br />other plans or in any proposed renewal of this plan. Any appeal of the decision made by <br />the State Engineer concerning this substitute water supply plan pursuant to 37-92-308(4) <br />shall be to the division waterjudge within thirty days of the date of this decision and shall <br />be consolidated with the application for approval of the plan for augmentation. <br />9. In accordance with C.R,S. 37-92-308(4)(a)(IV), the State Engineer shall determine <br />whether the substitute water supply plan will prevent injury to other water rights and <br />decreed conditional water rights, including water quality and continuity to meet the <br />requirements of use to which the senior appropriation has been applied. <br />10. Acceptance of these conditions shall be assumed unless a letter to the contrary is <br />received by this office, the Division Engineer (310 E. Abriendo, Suite B, Pueblo CO <br />81004), and the Water Commissioner (Charlie Judge, P.O. Box 100, Wetmore, CO <br />81253), within two weeks of your receipt of this letter. <br />Should you have any questions, please contact Keith Vander Horst of this office or <br />Kalsoum Abbasi, Augmentation Coordinator, in our Division 2 office in Pueblo at (719) 542- <br />3368. <br />el~ <br />ick Wolfe, P.E. <br />Assistant State Engineer <br />cc: Steve Witte, Division Engineer <br />Charlie Judge, Water Commissioner <br />Division of Minerals and Geology /~ <br />Objectors in 02CW122: <br />SECWCD (Stephen H. Leonhardt) <br />City of Cripple Creek {James G. Felt) <br />CWCB (Alexandra L. Davis) <br />DOW (Stephen C. Cann) <br />Canon Heights Irrigation and Reservoir Co. (Julianne M. Woldridge) <br />City of Colorado Springs (William Kelly Dude) <br />Beaver Park Water, Inc. (Robert F.T. Krassa) <br />,. <br />DW/KV H: CC&V-ssp-2006.doc <br />