Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />E~~A <br />s CvarCvmpany Seneca Coal Company <br />JUIrF~I/ED <br />U ~ 1.996 <br />July 3, 1996 <br />Division; of nunerals & Geoio9Y <br />Ms. Janet Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Ms. Binns: <br />Enclosed are copies of the second quarter stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The 'as-built' certifications will be submitted as <br />soon as possible once they are finished. <br />Maintenance work on all stockponds as well as the construction <br />of two new stockponds in the Auger Area E drainage will be done <br />this summer. Comments from the last inspection were not removed <br />from the inspection sheets because all maintenance work still <br />needs to be completed and no change in conditions were noted. <br />Several of the drainages where stockponds are located were also <br />noted in the 1996 Rill & Gully Survey, submitted earlier to the <br />Division. <br />Should you have any questions <br />please do not hesitate to call. <br />Sincerely, <br />00 EG <br />~~(/ V rV ~ ~ O I" w--- <br />Micha 1~. alit 1 P.E. <br />Engin eking Ianag~r <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />JUL 0 3 1996 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FA% (970) 276.9014 <br />