Laserfiche WebLink
. Section 827.12(1) Continued. <br />No underground coal mining activities are conducted on or neac the <br />Kerr Tipple Area. This requirement is not applicable. <br />(m) Reclamation shall include proper topsoil handling procedures, re- <br />vegetation, and abandonment, in accordance with 30 CFR 816.56, 816.100- <br />816.106, 816.111-816.117, and 816.131-816.133. <br />Complete details regarding topsoil handling, revegetation, abandon- <br />ment and other reclamation procedures Eor the Kerr Tipple Area are <br />Eound in Sections 780.18, 780.21, 780.23, 780.25, 816.21-816.25, <br />816.97, 815.100-816.103, 816.111-816.117, and 816.131-816.133. <br />• (n) Conveyors, buildings, storage bins or stockpiles, water treatment <br />facilities, water storage facilities, and any structure or system re- <br />lated to the coal processing plant shall comply with 30 CFR 816. <br />Complete discussions on conveyors, buildings, storage bins, stock- <br />piles and all other related structures at the Kerr Tipple Area are <br />found in Sections 780.12, 780.37, 816.46, 816.49, 816.180, and <br />816.181. <br />(o) Any coal processing plant or associated structures located on prime <br />farmland shall meet the requirements of 30 CFR 823. <br /> As discussed in Sections 779.27, 785.17, and 823, the Kerr Tipple <br />• Area is not lcoated on prime farmlands, thus this requirement is <br /> not applicable. <br />827-5 <br />