My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48640
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:35 PM
Creation date
11/20/2007 1:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Sections 7-14
Section_Exhibit Name
EXHIBIT 17 Haul Road PART 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-18- <br />Mr. Richard Atkinson <br />• May 14, 1981 <br />Page Four <br />Using the disturbed area percentages as listed in the preceding tabulation <br />weighted CS values were ccmputed with the results being: <br />Streeter Gulch, CS = O.G92 x 8.656 + 0.013 x 91.4°6 = 0.020 <br />Gulch A, CS = 0.092 x 15.456 + 0.013 x84.65'0 = 0.025 <br />The Ade^yuacy Revievr also questioned the CR factor asking hour many diversions <br />vrere used in its computation. In our calculations we had used a P factor, the . <br />_ equivalent of the CR facto, of 1.0. This is the maximum value to f1e used fcr this <br />factor and corresponds to no diversions in the formula CR = 1 /(n+1)z. <br />Using the revised sediment delivery ratios and the vreichted CS fatter the 3-year <br />sediment yields have been reccmputed with the results cs follovrs: <br />Sedimentation Ponds <br />Taylor C-inch Str=eter Gulch \`Jork Lecdcut <br />Tributary Gulch A Area Area <br />Se~iment yield - 3 years <br />• ... ~evicwsly_ccm~ted (acre-feet) 0.92...... L.07 .. A.53 .. C.52 0.32 <br />Sedia~: nt yield - 3 years <br />as revised (age-feet) 1.38 1 .66 1.17 0.62 0.74 <br />Provided sediment <br />volume (acre-feet) 1.78(1) 1.85 1.26(2} 12.73 1 .04 <br />(1} 1^Jith principal spillway elevation revised from 6938.0 to <br />6939.0. No other chances needed. <br />(2) With principal spillway elevation revised from 6614.0 to <br />6615.0. No other changes needed. <br />4. Sediment Clean-out; The Adequacy Report requires that ponds have a sediment <br />mar er installed at the 60°6 sediment storage volume (60'0 of the 3 year sediment <br />yield) elevetion. Vr~e concur with this requirement and the 60'.'o elevations are <br />as follows: <br />Sedimentation Pond <br />Taylor Gulch Tributary <br />Streeter Gulch <br />• Gulch A <br />York Area <br />Loadout Area <br />Elevations <br />Invert 60°.6 Vo . -100'6 Vo . <br />6935.0 6937.3 6938.4 <br />6581.7 6583.2 6583.8 <br />6611.0 6613.8 6614.8 <br />7149.5 7149.7 7149.8 <br />6381.0 6383.9 6384.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.