My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20693
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:56 PM
Creation date
11/20/2007 1:42:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
2/7/1985
Doc Name
FILE C-047-81 CERTIFICATION OF PONDS 3 AND 4 AND DELAY IN CERTIFICATION OF THE HAUL ROAD AND THE BEN
From
BLUE RIBBON COAL COMPANY
To
MLR
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:r <br /> <br />blue <br />ribbon <br />coal <br />company <br />RECEIVED <br /> <br />MINED LAND RECLAMATION DIVISION <br />Colo. Dapt of Natural Resources <br />Sue Mowry <br />Reclamation •ipecialist <br />Colorado Mined Land Reclamation <br />1313 Sherman Street, Room 423 <br />Denver, CO 80203-2273 <br />III IIIIIIIIIIIIIIII <br />999 <br />blue ribbon coal company <br />p. o. box 58 <br />delta, Colorado 81416 <br />(303) 8747561 <br />2-4-85 <br />Re: File # C-047-81, certification of Ponds #3 and #4, and delay in certification <br />of the haul mad and the bench project. <br />Dear Sue: <br />In accordance with Rule 4.05.6(7) , #3 and #4 Ponds at the Blue Ribbon Mine have <br />been re-certified. This re-certification was done as a result of const:vction <br />completed in June 1984, following flooding of Hubbard Creek. <br />The projected completion date of certification of the ponds, the haul mad and the <br />quarterly inspection of the bench project was February 1, 1985. As discussed on <br />the phone today this date has come and gone without completion of the certifications. <br />I have requested a1 extension to which we have agreed upon February 19, on your <br />desk. <br />If there any further questions please feel free to contact me here at 929-5911 or <br />Grand Mesa Coal Co. at 856-6402. <br />Yours ly, <br />~/~ <br />Larry Reschke, <br />Mine Engineer <br />Enc. <br />cc Dale'Fenwlck <br />
The URL can be used to link to this page
Your browser does not support the video tag.