My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20665
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:55 PM
Creation date
11/20/2007 1:40:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
6/21/2005
Doc Name
2nd Qtr 2005 Inspection Report
From
DMG
To
WWC Engineering
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Second quarter 2005 inspections were performed on June 7, 2005. All structures were <br />functioning as designed. Although the function of the check dams has been considered adequate, <br />numerous check dams require minor maintenance to restore the structures original design. The <br />minor repairs are noted below. These repairs will be made in the 2005 season, along with any other <br />repairs identified during 2005 site inspections. <br />Repair <br />Item No. Location Work Description <br />1 CK-3 Embankment will be re aired at b ass of s illway <br />2 CK-4 Restore spillwa to eneral tra ezoid sha e <br />3 CK-5 Restore spillway to general trapezoid shape <br />4 CK-6 Restores illway to general tra ezoid sha e <br />5 CK-7 Restore spillwa to general trapezoid sha e <br />6 CK-8 Restores illway to general tra ezoid shape <br />7 CK-9 Restore spillway to general trapezoid shape, restore embankment at bypass <br />of s illwa <br />8 CK-10 Embankment will be re aired at b ass of s illway <br />9 CK-11 Restores illwa to eneral tra ezoid sha e <br />10 CK-12 Restore spillway to general trapezoid shape <br />11 CK-13 Restores illway to eneral tra ezoid sha e <br />12 CK-14 Restores illway to general tra ezoid shape <br />13 CK-15 Restores illway to eneral tra ezoid sha e <br />14 CK-16 Restores illway to general tra ezoid sha e <br />15 CK-17 Restore spillway to general trapezoid shape, cover fabric in spillway exit <br />channel <br />16 CK-18 Restore spillway to general tra ezoid shape <br />17 CK-19 Cover fabric in spillwa exit channel <br />18 CK-20 Exit channel re air <br />
The URL can be used to link to this page
Your browser does not support the video tag.