Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: West Taylor Pond <br />Location: Colowyo Mine <br />Client: AEP <br />Project No.: 07-7649 <br />Report No.: 3 <br />Date: 7/26/07 <br />Time: 5.0 <br />Mileage: 60 <br />Engr.lTech: RE <br />Work Performed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 11 through 14 on the <br />material being placed for the West Taylor Pond embankment fill. <br />The excavation contractor, Anson Excavation and Pipe, placed and compacted on-site materials for the <br />embankment fill. <br />Remarks: <br />The material tested generally met the project specifications for compaction and moisture content. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dusty Wiseman of Anson Excavating and Alan Jorgenson of Colowyo were notified of todays test results. <br />Att. A3-5 <br />