Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: West Taylor Pond <br />Location: Colowyo Mine <br />Client: AEP <br />Project No.: 07-7649 <br />Report No.: 2 <br />Date: 7/24/07 <br />Time: 7.0 <br />Mileage: 108 <br />Engr./Tech: RE <br />Work Performed: <br />As requested, we visited the project site on this date and conducted compaction test No.'s 5 through 10 and retest <br />No.'s 5A on the material being placed for the West Taylor Pond keyway backfill. <br />The excavation contractor, Anson Excavation and Pipe, placed and compacted on-site materials along the keyway <br />and for the embankment fill. <br />Remarks: <br />The material tested generally met the project specifications for compaction and moisture content. <br />Please refer to the attached sheet for results of todays testing. <br />Verbal Discussions: <br />Dusty Wiseman of Anson Excavating and Alan Jorgenson of Colowyo were noted of todays test results. <br />Att. A3-3 <br />