My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:53 PM
Creation date
11/20/2007 1:38:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Hydrology
Doc Date
1/4/1991
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850023 THE ROCKCASTLE CO
From
CDOH
To
BRENNAN STEIL BASTING & MACDOUGALL SC
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ (~ <br />PART I <br />Page 6 <br />Permit No. COC-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREIffilTS <br />1. Effluent Limitations <br />(c) General Limitations - Active and Poat-Mining <br />1. There shall be no discharge of sanitary waste waters from <br />toilets ar related facilities. <br />2. There shall be no discharge of floating solids or visible foam <br />in other than trace amounts. <br />3. No chemicals are to be added to the discharge unless permission <br />far the use of a specific chemical is granted by the permit <br />issuing authority and imposition of such special conditions as <br />are appropriate. <br />4. Bulk storage atructuree or petroleum products and other <br />chemicals shall have adequate protection so as to contain all <br />spills and prevent the material from entering discharged raters <br />or waters of the state. Additional requirements are set forth <br />in Section 311 of the Federal Clean Hater Act. <br />5. There shall be no land application of wastexater, other than <br />for dust control. <br />(d) Burden of Proof Requirement <br />The permittee has the burden of proof when requesting relief from <br />total suspended solids (TSS), total iron and/or settleable solids <br />limitations. <br />For rainfall, to xaive TSS and total iron limitations, it is <br />necessary to prove that discharge occurred within 48 hours after <br />measurable precipitation has stopped. In addition, to xaive <br />settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater than <br />the 10-year, 24-hour event has stopped. <br />For snoxmelt, to waive TSS and total iron limitations, it is <br />necessary to prove that discharge occurred xi thin 48 hours after <br />pond inflow has stopped. In addition, to xaive settleable solids <br />Limitations, it 1a necessary to prove that discharge occurred <br />within 48 hours after pond inflow volume greater than the 10-year, <br />24-hour event has stopped. <br />The division shall determine the adequacy of proof. <br />(e) Poet-Mining Areas <br />A post-mining area is defined ae an area Sn which active mining has <br />ceased, all surface areas have been returned to the required <br />contour and revegetatlon has begun. When the area serving an <br />outfall me eta these requirements the permittee shall notify the <br />division so that appropriate modifications can be made. Each <br />facility certification shall state whether active or post~ining <br />limitations apply to each authorized outfall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.