My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:53 PM
Creation date
11/20/2007 1:38:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Hydrology
Doc Date
1/4/1991
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850023 THE ROCKCASTLE CO
From
CDOH
To
BRENNAN STEIL BASTING & MACDOUGALL SC
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />COLORADO DEPARTt~NT OP HEALTH, Water Quality Control Division <br />Rationale - Page 3. PERMIT NUMBER: COC-850000 <br />The major types of wastewater in the coal mining industry are: (Continued) <br />2. Surface Runoff - Precipitation-induced runoff from an active mining area <br />including runoff from coal storage piles, preparation plants, refuse <br />piles, loadout facilities and other disturbed areas; also precipitation- <br />induced runoff from the revegetating surface of a post~ining area. <br />COVERAGE UNDER THIS PERMIT: <br />IInder this general permit, owers and operators of coal mining facilities may <br />be granted authorization to discharge into the waters of [he State of Colorado <br />provided the sources of wastewater from these facilities are limited to <br />precipitation-induced runoff. <br />This general permit does not cover coal mining facilities with discharges such <br />as mine drainage, a domestic sewage treatment plant discharge, spoils spring <br />wastewater, or coal preparation plant water. Discharge permits for these <br />facilities will be issued on an individual basis. <br />The following list shows additional criteria which will be used Sa evaluating <br />whether or not as individual permit may be required instead of a general <br />permit: <br />1. Prozimity of the operation to a landfill or mine or mill tailings; <br />2. Evidence of non-compliance under a previous permit for [he operation; <br />3. Presence of downstream drinking water intakes; <br />4. Preservation of high quality water; <br />5. Addition of flocculants (settling agents or chemical additives) to water <br />prior to discharge; <br />6. Use of land application as a means of discharge (other than for dust <br />control). <br />This permit does not constitute authority under the provisions of 33 USC 1344 <br />(Section 404 of the Clean Water Act) for any dredging or filling operations. <br />DURATION OF THIS PERMIT: <br />This permit Ss issued fora period of approzimately 5 years. The permittee's <br />authority to discharge under this permit is approved until the ezpiration date <br />of the general permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.