My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:53 PM
Creation date
11/20/2007 1:38:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Hydrology
Doc Date
1/4/1991
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850023 THE ROCKCASTLE CO
From
CDOH
To
BRENNAN STEIL BASTING & MACDOUGALL SC
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~ <br />A. MANAGEMENT REQUIREMENTS <br />9. Minimization of Adverse Impact <br /> <br />PART II <br />Page 16 <br />Permit No. COG-850000 <br />The permittee shall take all reasonable steps to minimize any adverse <br />impact to waters of the State resulting from noncompliance with any <br />effluent limitations specified in this permit, including such <br />accelerated or additional monitoring as necessary to determine the <br />nature and impact of the noncomplying discharge. <br />10. Discharge Point <br />Any discharge to the waters of the State from a point source other <br />than specifically authorized by this permit ie prohibited. <br />11. Reduction, Loss, or Failure of Treatment Facility <br />The permittee has the duty to halt or reduce any activity if <br />necessary to maintain compliance with the effluent limitations of the <br />permit. Upon reduction, loss, or failure of the treatment facility, <br />the permittee shall, to the eatent necessary to maintain compliance <br />with its permit, control production, or all discharges, or both until <br />the facility is restored or an alternative method of treatment Ss <br />provided. This provision for eaample, applies to power failures, <br />unless an alternative power source sufficient to operate the <br />wastewater control facilities is provided. <br />It shall not be a defense for a permittee in an enforcement action <br />that it would be necessary to halt or reduce the permitted activity <br />in order to maintain compliance with the conditions of this permit. <br />12. Proper Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all <br />facilities and systems of treatment and control (and related <br />appurtenances) which are installed or used by the permittee to <br />achieve compliance with the conditions of this permit. Proper <br />operation and maintenance includes effective performance, adequate <br />funding, adequate operator staffing and training, and adequate <br />laboratory and process controls, including appropriate quality <br />asauraace procedures. This provision requires the operation of <br />back-up or auzillary facilities or similar systems only when <br />necessary to achieve compliance with the conditions of the permit. <br />13. Discharge Effluent Sampling <br />Discharge points shall be so designed or modified that a sample of <br />the effluent can be obtained at a point after the final treatment <br />process and prior to discharge to state waters. <br />
The URL can be used to link to this page
Your browser does not support the video tag.