Laserfiche WebLink
<br /> SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN - 9/87 <br />1 Page 6 <br /> II. IE any additional fuel tanks are added, or if [he field fuel tanks are <br /> moved, a berm, as described in 112.7(3) above, will be built, or other <br /> appropriate measur es will be followed to control or contain an unexpected <br /> spill. <br /> III. In the event of a spill, the contaminated area will be cleaned up with <br /> on-site eauipmen[ and personnel. If the spill contains PCB's, the proce- <br /> dures outlined in Attachment C will be followed. We are currently arrang- <br /> ing for disposal o f thz last of our transformers that contain PCB's. <br /> IV. This plan will be updated whenever permanent st orage tanks are added or <br /> moved. <br />j <br />1 <br />r <br /> <br />i <br />i <br /> JMM/jb <br /> <br />i <br />