for loading, etc.) coal will be stockpiled in raw coal storage azeas within the facility. <br />Raw coal stockpiles will be maintained at adequate levels to insure continuing <br />operations during times when direct truck coal feed through the truck dump is not <br />available. <br />• The screening process involves the sepazation of various sizes within the raw coal, <br />dependent upon customer demand and requirement. Generally three (3) products are <br />made at the TCC facility; stoker, lump, and fines. On a typical basis, as received coal <br />typically contains approximately 30 percent fines, 60 percent stoker, and ten (10) <br />percent lump. <br />• Limited coal crushing is performed at the loadout facility. After initial size <br />sepazation, only that portion of the coal lazger than required for customer shipment is <br />crushed. Total percentage coal crushed during a typical yeaz has been less than ten <br />(10 percent total coal shipped. <br />• More than 85 percent of all cal sized at the TCC facility is directly loaded Into rail <br />cars at the time of screening for shipment to customers. The remaining portion of <br />sized coal, primarily stoker and lump, is stockpiled adjacent to the screening pants for <br />shipment by truck. Loading of trucks is done by front-end loader. <br />• During September of 1993 a truck loadout bin was installed on the site to facilitate <br />the selling of domestic stoker coal. The loadout bin is filled with afront-end loader. <br />Use of the loadout bin allows pickups and small trucks to be loaded efficiently. <br />• During February 2006, the original at-grade truck scale was replaced with an <br />elevated, portable, 3-segment, flatbed scale with duel approach ramps. Total actual <br />scale length is approximately 70 feet with the elevated running surface located 3.5' <br />above surrounding ground level. The scale is supported by four sets of movable <br />concrete blocks: one set of blocks is located under each approach ramp and two <br />2'x3'x12' blocks support the center segment of the scale. The old truck scale inner <br />workings and running surface were removed and filled with gravel and the remaining <br />below grade concrete box was used to support the new scale. <br />The layout and location of facilities at the TCC loadout aze shown on the Facilities Map <br />(Map 5). The flowsheet of the operation is included with this application as Loadout Facility <br />Flowsheet (Map 6). <br />MR-23 <br />A PP2ovED <br />3~6~0 6 <br />2.05 - 2Ra Rev. 2/06 <br />ti. ):1:: i;• , a., kn. - -..n.* Y,.t . pp,',. r.~iw::t. sT9~::~i' .:-'+..- <br />