Laserfiche WebLink
3.3 DRILLING <br />3.3.1 Types of Drill inv~ <br />At Trapper Mine there are three types of drilling: blast hole drilling, explora- <br />tion drilling and development drilling. Blast hole drilling occurs only within <br />the permit area and is required for the blasting operation, The boles are needed <br />for placement of explosives to fragment overburden, interburden and coal, Hales <br />sizes, depths and spacings vary according to the thickness and nature of the <br />material to be blasted. Because the holes are drilled just ahead of, or within <br />an advancing pit, they are removed by stripping or mining within several months <br />or less. For more detail on blasting, see Section 3.4. <br />Exploration drilling occurs outside the permit area and is required to determine <br />the extent of the coal reserves and Co provide information on coal depth, thick- <br />ness and quality. ALL exploration drilling is conducted in compliance with <br />applicable U.S, Bureau of Land Management and S[aCe of Colorado regulations and <br />will be handled by separate permits, <br />Development drilling is required to provide data for planning pit dimensions, <br />sequencing activities and equipment scheduling. Typically, development drilling <br />is conducted at at neat the projected coal cropline and the economic stripping <br />limit ahead, of advancing pits and where new pits are planned within the permit <br />area. Drilling depths needed to further define the cropline are usually only to <br />the coal in question- Depending upon [he information obtained, drilling may be <br />conducted defining the crapLlne.to within 25 fee[ horizontally. The economic <br />stripping Limit is defined in much the same manner except it is not necessarily <br />located as accurately as the cropline. <br />Prior to stripping, the overburden is drilled and blasted, Overburden drilling <br />and blasting precedes stripping by one to five pit widths. Before the overburden <br />is drilled and blasted, [he topsoil is removed. Topsoil removal is conducted <br />during the fair aeathet months of May throughOctober. Therefore, each year's <br />3-22 REVfSfON <br />APPROVED <br />DATE 2 ~'~9'$~. ~.~. <br />.~.2 -~ y <br />R~V1S~D FEB 10'8a <br />