My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48404
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:22 PM
Creation date
11/20/2007 1:35:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES 2.06.1 SCOPE
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The construction of the fill in Streeter Draw began in January, i <br />• 1977. Streeter Fill had been approved as part of an interim mine <br />plan to produce 250,000 tons/year from the "X seam" only, both by <br />the United States Geological Survey (USGS) in an approved federal <br />mining plan pursuant to the regulations at 30 CFR Section 211.10 <br />and by the Colorado Mined Land Reclamation Board (MLRD) in <br />Extraction and Development Permit Number 76-15 C/A. <br />In early 1977, Colowyo contracted with Golder Associates to perform <br />a stability study on Streeter Fill to expand on previous <br />engineering studies. The results of their work, Waste Dump <br />Stability Study (April, 1977), found in Exhibit 12, Experimental <br />Practice Information, demonstrated that the planned construction <br />techniques of Colowyo would ensure stability. <br />In December, 1978, Ms. Carolyn Johnson and Mr. Charles Callison of <br />the Public Lands Institute, Inc., submitted a Citizen's Complaint <br />to the Office of Surface Mining. Two of the complaints alleged <br />that Colowyo was not constructing the Streeter Fill in compliance <br />with OSM Interim Regulations. <br />• As a result of a request from the Public Lands Institute, Inc., a <br />joint inspection of the mine {and Streeter Fill) was conducted by <br />OSM and the Division. A notice of violation was issued to Colowyo <br />regarding the construction of terraces on the face of the fill. <br />Colowyo applied to the Office of Hearings and Appeals for review of <br />the Notice of Violation issued regarding the construction of <br />Streeter Fill. <br />Prior to the first scheduled evidentiary hearing, Colowyo and OSM <br />agreed to postpone the hearing until the completion of an <br />independent engineering study of the stability of the Streeter <br />Fill. OSM contracted with CTL/Thompson, Inc. to conduct a <br />geotechnical analysis of the fill. The report by CTL/Thompson, <br />Inc., Slope Stability Colowyo Streeter Canyon Fill (August, 1979) <br />along with miscellaneous OSM correspondence is found in Exhibit 12, <br />Experimental Practice Information. <br />• <br />2.06-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.