Laserfiche WebLink
<br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: CA2/IY ~~~~kc Date: 4-z~-93 <br /> <br />Pond Number: ~ Date Last Inspection: /-ZG• 93 <br />Site Name: C'kDA ~/ Quarter: -TPCe,.,r/ /99~ <br /> <br />1. Design Depth Measured From Spillway Invert ~ 0 <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert 2 4 0 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert /,~ f <br />4. Water Level Measured From Spillway Invert ,,, o.v2 <br /> <br />5. Discharge Through Spillway Since Last Inspection ` Yes k No <br />6. Ril]s and Gul]ies Yes ~' No <br />7. Vegetation Adequate ~' Yes No <br /> <br />8. Outlet Channel Erosion Yes l~ No <br />9. Animal Burrows Yes X No <br />10. Cracks _ Yes k No <br />11. Seepage -Yes 1( No <br />I2. Spillway Clogged Yes ~' No <br />13. Valves Operational ~' Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />-- 4 ~ <br />1~. W y~ <br />v R <br /> SP/ttWAY SNVE. <br />-~,'-- - <br /> 2 <br /> „ ~ 4 C <br />W O, W <br />