Laserfiche WebLink
<br />COAL COMPANY QUARTERtI' POND INSPECTION REPORT <br />¢y <br />Inspector Name: LA/z 1~2rc~k~ Date: 9-21-93 <br />~ <br />Pond Number: <br />d Date Last Inspection: /- 26.93 <br />//~~ <br />Site Name: c~9m.,~ <br />xo~ ~/ Quarter: ,f2ce. ~l 199.? <br />, <br />1. Design Depth Measured From Spillway Invert /, n S <br /> <br />2. Design Maximum Sediment Le vel Measured From Spillway Invert /, O o <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2. 8 <br /> <br />4. Water Level Measured From Spillway Invert ,Vr.ut <br /> <br />5. Discharge Through Spillway Since Last Inspection _ Yes ~ No <br />6. Rills and Gullies Yes I' No <br />7. Vegetation Adequate ~ Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes k No <br />10. Cracks _ Yes 1C No <br />11. Seepage `Yes ?< No <br />12. Spillway Clogged _ Yes k No <br />13. Valves Operational ~ Yes _ No <br />ADDITIONAL COMMENTS: io,vt <br />MAINTENANCE REQUIRED: 1t,o,vt <br />- - 4 F - <br />W ,~ 0 ~ C <br />3 ~ rp <br /> SP/L[WAY SHV~ <br />- ~--- - <br />~ ~ 2 2 Z <br /> Q <br />W W ~ W W <br /> <br />