My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20476
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:47 PM
Creation date
11/20/2007 1:34:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
1/9/1997
Doc Name
ANNUAL REPORT COAL
Permit Index Doc Type
OTHER SURFACE WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•~LORADO DEPT. OF PUBLIC I~ALTIi & ENVIRONMENT <br />Water Quality Control Division <br />W QCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />Please print or type. FYII in each section. <br />III III'IIIIIIII I Da~ReceivedONLY <br />sss <br />Ye:tr hionth Day <br />Permittee (Company Name): National KinP Coal., LLC 1~FCEIVED <br />Facility Name: King Cua1 Aline <br />Facility Address: ~~24 C.I'. 120 .IAN 09 1997 <br />iiesperus, Co. 81326 <br />Llivicinn ni ~~.pnN, n~S ~~. 1,~blpgr <br />Facility Phone Number: !270 ) 385-L606 <br />Permit Certification No. COG-850 ~ Q L <br />Reporting Period: ]an. 1-Dec. 31, 19 9 6 <br />A. A report on the facility's overall compliance with the SWMP. (Include here a sutttmary of any measures <br />taken to comply with your Stormwater Managemen[ Plan (SWMP), to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), problems encountered, spills, <br />other potential violations, etc.). <br />All aspects oi' the Stormwater Afanagement Plan i'or the King Coal hlir.e have been <br />1n51'•PC}~.~ T'Q6tllarl7 throuehout the vear. Un July 18 199E, a r~s,e thunderstorm occurred <br />tar exrePrline the 100 vear/211 hour nvent. Some problems resull;ed and are detailed in a <br />report submitted to your office on 10/21/96, Otherwise, all s}stems functioned as per <br />Were changes made to your SWMP? ®No ^ Yes -Describe changes on a separate sheet. <br />B. A swrunary of each Comprehensive stormtvater jociliry inspection mule, lnclr:~ing datr, frrulinb~, alul <br />action token. (The permit requires at least two comprehensive facility inspections per year -see page f0 <br />of the permit. Include here a summary of those inspectiuns, plus any other comprchensivc inspections <br />made. his nul ntxess:u'y lu xummarize Jay-lu-Jay inspcctiuus, unless siLuillc:utl plublruls welt puled.) <br />"{ 41 y!. IL~~~ hlriy,l'. P:, 1,c+1n~r Lu Llu: rn1.1 n' Xkkll <br />First Inspectiun - llate _/_/_. Pinrlings, :u 1J actiun taken: - <br />facility on a quarterly basis as per CDA1G ret;ulatiuns re.LatinC Lo wrlstepil.e^, and <br />surface hydrology. There Caere two places in drainaPe cha'~nels which wore partially <br />obstructed due to heav vPPetatien and dirt. These prohlems o-u,re r?medicd immediately <br />n~f~:rt.h~r::rnbl.Pms worn nntedw,mn noted. <br />*Note -Cana tt>:ry t>,; reproJuccJ PagC 1 of 2 ar1119i:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.