Laserfiche WebLink
GRHND VALLEY COAL COMPANY <br />POND INSPECTION REPORT <br />28-Jun-0O <br />OPERATIONAL STATUS AT TIME OF INSPECTION <br />APPROXIMATE WATER LEVEL <br />SEDIMENT LEVEL <br />OUTFLOW (cfs ) <br />FEATURES <br />EROSIONAL <br />RILLS & GULLIES ON EMB <br />INADEQUATE VEGETATION <br />OUTLET CHANNEL EROSION <br />BURROWS <br />OTHER <br />STRUCTURAL <br />DIFFERENTIAL SETTLING <br />CRACKS OR SLIDES <br />SEEPAGE <br />OTHER <br />APPURTENANT STRUCTURES <br />DEFECTIVE SPILLWAYS <br />DEWATERING DEVICE CLOGGED <br />FAULTY GATES, BAFFLE5 <br />OTHER <br />ADDITIONAL COMMENTS <br />MAINTENANCE REQUIRED <br />'Zw~-~~ <br />McCLANE CANYON MINE <br />C-004-80 <br />SEDIMENT SAE 1 SAE 2 SAE 3 <br />POND OFFICE TOPSOIL RIP-RAP <br />0% 0% 0% 0% <br /><5% <5% <5% <5°l0 <br />0 0 0 0 <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />No No No No <br />Sediment pond precleaner full. <br />Needs to be cleaned. <br />NONE <br />//- . <br />INSPECTOR ~l /' ( < « <br />.~ <br />~~ <br />