My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20412
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:44 PM
Creation date
11/20/2007 1:32:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Hydrology
Doc Date
3/11/2002
Doc Name
1st Quarter 2002 Sediment Pond Inspection
From
Peak Project Management LLC
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • <br />• <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />-' CDMR Rule`4.06.6(13) <br />Mine: Lorencito <br />NPDES ID. No.: Pond #10A-Loadout <br />Inspection Period: 1st Quarter 2002 <br />Inspection Date: 23-Feb-02 <br />General Description or Reference to Site Plan: <br />This pond is located east of fhe coal loadout facility and south of the railroad tracks <br />The pond is partially incised into alluvium and the embankment keyed into the <br />subsurface strata. Side sopes are less than 2H:1 V. The pond discharges into Lorencito <br />Canyon Creek. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent Moderate Few <br />Extensive Some Few <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />Poor ~ ~~tcv>J <br />None <br />No //' <br />No L~ <br />No r. <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No ~- <br />• <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working orde(~ <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Page 1 of Z <br />Yes C.~- No <br />Yes !/ No <br />Yes Lam- No <br />Yes No (/ <br />Just starting None <br />_. <br />
The URL can be used to link to this page
Your browser does not support the video tag.