My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20395
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:43 PM
Creation date
11/20/2007 1:32:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
10/5/1990
Doc Name
3rd Qtr 1990 Inspections
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Dennis Jones DATE: 7/25/90 <br />NPD ES I.D. NO.: - D.P. 003 <br />FAC ILITY CONFIGU Diked Pond DATE LAST INSPECTIO N: 5/7/90 <br />SITE NAME: Northwest Im oundment #003 LOCATION:SE'hSW'/. ,Sec .2 T~ 6N,~F87Gr <br />MIN E NAME: eneca pine ea o y oa o LOCATION: mi. o ay en, <br />MIN E I.D. N .. ermit - - OWNER'S R .. on u ian, upt. <br /> Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil}: _ es No N/A <br />2. Lift thickness: t2 in. N/A <br />3. Compaction according to approved plan: ~~ No N/A <br />4. Burning (specify extent and location): Yes No N/A <br />5. Angle of slope: 2:1 upstream, 3:1 downstream Tntal = 5:1 N/A <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: Yes No Li~[g; <br /> At isolated points on em an ment s opes: Yes N' N/A <br /> At natural hillside: Yes ~ N/A <br /> Over widespread area::: Yes N N/A <br /> From downstream foundation area: Yes N/A <br /> "Boils" beneath stream or ponded wa er: Yes ~ N/A <br />7. Cracks or scarps on crest: Yes ,N~ N/A <br />8. Cracks or scarps on slope: Yes :Ng N/~ <br />9. Sloughing or bulging on slope: Yes N~i N/A <br />10. *Major erosion problems: Yes Nl~ N/A <br />11. Surface movements in valley bottom or on hillside: Yes ~N~ N/A <br />12. *Erosion of toe: Yes L N/A <br />13. *Water impounded against toe: Yes ~ N/A <br />14. Existing embankment freeboard: 4.9 feet <br />15. Increase Decrease in water level: 0 feet <br />16. Cracks, bulging, or erosion on upstream face: Yes etig N/A <br />17. Visible sumps or sinkholes in slurry surface: Yes No N/A' <br />18. *Clagging <br /> Spillway channels and pipes: Yes N9 NfA <br /> Decant system: Yes No QJLA,' <br /> Diversion ditches: Yes 'Ng N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes `No N/A <br /> Decant system: Yes <br />-- No ~, <br /> <br />20. <br />Trash racks clear and in place: ~ <br />. <br />Ye s1 <br />No <br />N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse condi- <br />tions noted in these items should normally be described (extent, location, volume, etc.) <br />in the space on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.