Laserfiche WebLink
ON,A-1 <br />SECTION A -� SE C� <br />I - DIVERSION DITCH A. PERMANENT 4' TO 6' WIDE 2' TO 25' DEEP <br />-� UNDISTURBED AREA DIVERSION DITCH. WHERE DITCH IS NOT <br />- _ EXCAVATED IN ROCK, LINE WITH 12 MEDIAN <br />■ ' __ _ ___ - - - _ DIAMETER RIPRAP <br />■ <br />\\ ■ ` \ \ BUILD WASTE ROCK <br />�\ \ PILE UPSLOPE INITIAL LOCATION FOR <br />EXCESS CUT MATERIAL <br />\■ P� \ \ _ FROM PROCESSING AREA <br />cam\ �� � ♦' � �� <br />-747-5 <br />■ �� �\ ` 051 r <br />■ �� �� S <br />■ _�`� PROCESSING PLANT AND PRO DUCT <br />STOCKPILE AREA <br />UNDERDRAIN OF COARSE 6" MEDIAN \P� ; �` APPROX. 4 ACRES AT 7200 FT. ELEV. <br />DIAMETER ROCK WITH LESS THAN 10% �Q� \` ' (AREA EXCAVATED AND EXCESS CUT MATERIAL PLACED <br />I PASSING THE #200 SIEVE IN THALWEG �G i / TEMPORARY WASTE ROCK PILE) <br />TO CONVEY SUBSURFACE FLOWS Gj <br />STOCKPILED ROCK (TEMPORARY) - - <br />I \ <br />AND WASTE ROCK (PERMANENT) \ f <br />■ TO BE DUMPED AND MOVED FROM <br />■ HAUL ROAD 8Y DOZER OR LOADERS ` <br />■ TEMPORARY'SEDIMENT POND B - <br />ICAPACITY 37,200 FT' <br />I <br />I <br />SCALE HOUSE OFFICE <br />--.M1, -11 -. irI CR CULVERT <br />.ES <br />'LANT <br />♦ O�A g�3 <br />■ - - - OVERALL SLOPES IN THIS <br />AREA NO GREATER THAN 1.25V:1H <' 1\ �\ \ ♦ �� <br />AREA OF DISTURBANCE ,h <br />I - - - FAR PROCESSING PLANT `� TEMPORARY 48" DIAMETER CULVERT <br />AREkCONSTRUCTION I Ox� <br />- "K. v 1 <br />■ EXISTING ROAD - _ 14.3% r ' <br />IX <br />ww� 014 <br />ev- <br />__ -- INTERNAL HAUL ROAD TO <br />-- -- <br />TEMPORARY WASTE ROCK <br />f?Hlt low STORAGE AREA <br />_ -- <br />a, <br />--------- - - - <br />_- -- - i ------ --'\ � TEMPORARY <br />-- - -- - - , <br />CAP CI 220,000 FT' \. <br />(SPILLWAY VATION < 10' <br />- - - - -- - �e_ -•.. r --- 5� �� \\ �i. FR M STREAM BED) y� \ <br />. . <br />LEGEND 7`'' ` SF <br />.. . ■ ■ • ■ ■ PERMIT BOUNDARY <br />MINING LIMITS / \ \\ <br />.`�. \ �. <br />SF <br />RIGHT OF WAY <br />PAVED ROAD <br />- UNPAVED ROAD \ '/ <br />- - DITCH /WATERWAY �`• S ��.•_ <br />} - - - - - - DIVERSION DITCH <br />> FLOW DIRECTION <br />EXISTING INDEX CONTOUR <br />EXISTING INTERMEDIATE CONTOUR <br />PROPOSED INDEX CONTOUR <br />PROPOSED INTERMEDIATE CONTOUR <br />EXISTING STRUCTURE <br />;F ,F SILT FENCE <br />0 STREET LIGHT <br />OHU OHU OVERHEAD UTILITY <br />5 5 SEWER LINE (UNDER CONSTRUCTION) <br />EXISTING 6'X8' CONCRETE <br />BOX CULVERT <br />GRAPHIC SCALE <br />0 50 100 <br />( IN FEET ) <br />1 inch = 100 ft. <br />CONTOUR INTERVAL = 5 <br />DIVERSION DITCH B PERMANENT 6' WIDE 3' DEEP <br />UNDISTURBED AREA DIVERSION DITCH <br />� S <br />S <br />MAIN ACCESS ROAD <br />RIPRAP PAD WHERE DIVERSION JOINS CHANNEL <br />DIVERSION DITCH <br />HAUL ROAD <br />25' BENCH (TYP. FOR SW WALL) <br />EXISTING GROUND <br />50' FACE (TYP. FOR SW WALL) <br />1.0 <br />ACCESS ROAD <br />L 1 <br />OVERALL SLOPE NOMINAL ELEVATION 7200 DIVERSION DITCH B <br />08 <br />OVERALL SLOPE <br />TYPICAL SECTION ACROSS PROCESSING PLANT AREA <br />NOT TO SCALE <br />W (WIDTH) - <br />v <br />D (DEPTH) <br />RIPRAP SPILLWAY <br />TYPICAL SPILLWAY <br />RIPRAP LINED EMERGENCY SPILLWAY Imo- L (LENGTH) - <br />-\ � -- DISTURBED AREA DRAINAGE <br />\\ <br />I D (DEPTH) <br />/-�P.) NOTES: <br />I 1. POND CONFIGURATION MAY VARY AS MINING PROGRESSES. <br />PRINCIPAL SPILLWAY (CONFIGURATION MAY VARY) 2. CONSTRUCT PRINCIPAL SPILLWAY RISER PIPE OR OTHER <br />WATER QUALITY CONTROL OUTLET WITH ORIFICES TO <br />EPHEMERAL CHANNEL ALLOW WATER ABOVE SEDIMENT LEVEL TO DISCHARGE IN 72 <br />HOURS. <br />B <br />(ft) <br />SEDIMENT POND <br />DEPTH <br />WIDTH <br />AVERAGE DEPTH <br />"VOLUME <br />A <br />2' <br />10' <br />B <br />2' <br />10' <br />C <br />3' <br />25' <br />TYPICAL SPILLWAY <br />RIPRAP LINED EMERGENCY SPILLWAY Imo- L (LENGTH) - <br />-\ � -- DISTURBED AREA DRAINAGE <br />\\ <br />I D (DEPTH) <br />/-�P.) NOTES: <br />I 1. POND CONFIGURATION MAY VARY AS MINING PROGRESSES. <br />PRINCIPAL SPILLWAY (CONFIGURATION MAY VARY) 2. CONSTRUCT PRINCIPAL SPILLWAY RISER PIPE OR OTHER <br />WATER QUALITY CONTROL OUTLET WITH ORIFICES TO <br />EPHEMERAL CHANNEL ALLOW WATER ABOVE SEDIMENT LEVEL TO DISCHARGE IN 72 <br />HOURS. <br />RIPRAP PAD AT TOE ' 10 -YEAR / 24 -HOUR RUNOFF <br />OF SPILLWAY "* 10 -YEAR / 24 -HOUR RUNOFF (TEMPORARY) <br />PRELIMINARY SEDIMENT POND PROFILES <br />(FINAL DESIGN AS REQUIRED BY CDPS PERMIT) <br />NOT TO SCALE <br />1' HIGH, 3' WIDE BERMS TO PREVENT PIT FLOOR RUNOFF FROM ENTERING DIVERSION <br />1' MIN. FREEBOARD <br />H <br />d <br />go <br />t <br />B <br />DITCH B CROSS SECTION <br />1' MIN. FREEBOARD <br />H <br />d <br />ADJUST ALIGNMENT AND /OR <br />HEIGHT (H) 50 THE DEPTH (d) <br />CHANNEL <br />SECTION <br />B <br />(ft) <br />SEDIMENT POND <br />LENGTH <br />WIDTH <br />AVERAGE DEPTH <br />"VOLUME <br />"EMERGENCY <br />SPILLWAY FLOW <br />6.0 <br />3.0 <br />A <br />55' <br />30' <br />8.0' <br />13,100 FT <br />2.2 CFS <br />B <br />65' <br />65' <br />85 <br />54,900 FT <br />15.6 CF5 <br />C <br />100' <br />130' <br />17' <br />193,000 FT <br />59.5 CF5 <br />RIPRAP PAD AT TOE ' 10 -YEAR / 24 -HOUR RUNOFF <br />OF SPILLWAY "* 10 -YEAR / 24 -HOUR RUNOFF (TEMPORARY) <br />PRELIMINARY SEDIMENT POND PROFILES <br />(FINAL DESIGN AS REQUIRED BY CDPS PERMIT) <br />NOT TO SCALE <br />1' HIGH, 3' WIDE BERMS TO PREVENT PIT FLOOR RUNOFF FROM ENTERING DIVERSION <br />1' MIN. FREEBOARD <br />H <br />d <br />go <br />t <br />B <br />DITCH B CROSS SECTION <br />1' MIN. FREEBOARD <br />H <br />d <br />ADJUST ALIGNMENT AND /OR <br />HEIGHT (H) 50 THE DEPTH (d) <br />CHANNEL <br />SECTION <br />B <br />(ft) <br />H <br />(ft) <br />SLOPE <br />(ft /ft) <br />CAPACITY <br />(ft3) <br />d <br />(ft) <br />V <br />(fps) <br />B -1 <br />6.0 <br />3.0 <br />0.0702 <br />218 <br />2.0 <br />12.1 <br />B -2 <br />6.0 <br />3.0 <br />1.78 <br />WATER FALL EFFECT <br />B -3 <br />6.0 <br />3.0 <br />0.0192 <br />114 <br />2.0 <br />6.33 <br />B -4 <br />6.0 <br />3.0 <br />0.200 <br />368 <br />2.0 <br />20.4 <br />CHANNEL <br />SECTION <br />B <br />(ft) <br />H <br />(ft) <br />SLOPE <br />(ft /ft) <br />CAPACITY <br />(ft) <br />d <br />(ft) <br />V <br />(fps) <br />A -1 <br />4.0 <br />2.0 <br />0.0581 <br />39.7 <br />1.0 <br />7.2 <br />A -2 <br />4.0 <br />2.0 <br />0.438 <br />109 <br />1.0 <br />19.8 <br />A -3 <br />6.0 <br />2.5 <br />0.0266 <br />79.2 <br />1.5 <br />6.4 <br />A -4 <br />6.0 <br />2.0 <br />0.413 <br />152 <br />1.0 <br />20.2 <br />A -5 <br />6.0 <br />2.0 <br />0.143 <br />91.5 <br />1.0 <br />12.2 <br />A -6 <br />1.0 <br />25.0 <br />0.198 <br />94.8 <br />1 1.0 <br />12.6 <br />B - I FLOWS IN COMPETENT ROCK <br />NOTES: <br />1. BASE WIDTH AND CHANNEL HEIGHT ARE MINIMUM VALUES. <br />DITCH A CROSS SECTION 2. SIDE SLOPES 151 MAXIMUM. <br />3. CUT CHANNEL DEEPER IF REQUIRED TO REACH COMPETENT ROCK. <br />TYPICAL DIVERSION DITCHES 4. WHERE DITCH IS NOT LOCATED ON COMPETENT ROCK, OVER EXCAVATE AND PLACE FILTER <br />NO SCALE FABRIC, IF REQUIRED, AND PLACE 24" THICKNESS OF 12" MEDIAN DIAMETER RIPRAP ON DITCH <br />BOTTOM AND SIDES. <br />NOTES: <br />1. PROCESSING PLANT AREA AND INTERNAL HAUL ROAD WILL BE CONSTRUCTED AT THE SAME <br />TIME AS THE MAIN ACCESS ROAD. A 3' MINIMUM HEIGHT (OR AS REQUIRED BY EQUIPMENT) <br />BERM WILL BE CONSTRUCTED ON THE EDGE OF ALL ROADS WHERE IT IS POSSIBLE FOR TRUCKS <br />TO RUN OVER EDGE. <br />2. WASTE ROCK WILL BE MOVED BACK TO PLANT AREA FOR PROCESSING AFTER PLANT I5 <br />CONSTRUCTED. <br />3. APPROXIMATELY 826,000 CU. YD. OF MATERIAL WILL BE EXCAVATED FROM PROCESSING PLANT <br />AREA AND HAUL ROAD CONSTRUCTION. <br />4. WASTE ROCK PILE FOOTPRINT WILL BE STRIPPED OF SOIL, VEGETATION AND SNOW OR ICE <br />DOWN TO STABLE BEDROCK PRIOR TO PLACING WASTE ROCK. THE U5EABLE SOIL WILL BE <br />STOCKPILED FOR USE IN REVEGETATION. A GEOTECHNICAL INVESTIGATION WILL BE <br />COMPLETED BEFORE WASTE ROCK PLACEMENT TO DETERMINE SLOPE STABILITY. BENCHING OF <br />THE SUBGRADE WILL BE COMPLETED IF REQUI <br />5. SEDIMENT POND C SHOWN IS MAXIMUM SIZE REQUIRED AT THE COMPLETION OF THE 10 -YR <br />QUARRY. THE QUARRY OPERATOR MAY CONSTRUCT AN INTERIM SMALLER POND AT THIS <br />LOCATION OR OTHER LOCATIONS ON THE PIT FLOOR TO BE INCREASED IN VOLUME AS MINING <br />PROGRESSES.' <br />6. SEDIMENT PONDS 14ILL BE INSPECTED FOLLOWING SIG CAN�VVNOFF EVENT AND <br />SEDIMENT REMOVED I: NECESSARY. <br />I �4 *° <br />wear .. <br />PREPARED UNDER THE SUPERVISION OF: <br />Permit #: w <br />Class: <br />From: <br />Doc. Name <br />Doc. Date (if n date <br />Specialist: <br />TITLE <br />I <br />No <br />REVISED EXHIBIT C -2B: CONSTRUCTION OF PROCESSING PLANT AREA <br />RED FOR WASTE ROCK PILE STABILITY. <br />ME BANKS AND GESSO, LLC CLEAR CREEK DISTRICT WATER PROVIDERS, LLC. MMRR QUARRY <br />No720 KIPLING St., SUITE 117 DMG REGULAR 112 PERMIT APPLICATION <br />LAKE'A/OOD, COLORADO 80215 5460 SOUTH QUEBEC ST. SUITE 110 GILPIN COUNTY <br />(303) 274 -4277 GREENWOOD VILLAGE, CO 80111 COLORADO <br />JOB NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEET <br />03047 8/16/05 111=100' DRF 3of5 <br />