Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />October 3O, 1979 <br />Mr. C. Clifford Clayton <br />DBA Clayton Construction Company <br />254 Byers Avenue <br />Post Office Box 26 <br />Fraser, Colorado 80442 <br />Attn: Cristy <br />Re: Clayton - ;turphy Gravel Pit <br />Our file X79-187 <br />Dear Ms. Cristy: <br />In order to consider this application adequate for the December 19-21„ <br />1979, meeting of the ?•fined Land P,Eclamation P,oard, ke cvill need the <br />followin@: <br />A, Exhibits F. t+ C - Index. Piap and Pre-Mining and Mining Plan Maps. <br />1. tde need these items as discussed over the phone on October <br />3O, 1979. <br />B. Exhibit D - Dlining Plan <br />1. How many inches of topsoil will be removed and stockpiled? <br />2. How many inches of overburden will be removed and stockpiled? <br />3. Where will the stockpiles be located? <br />4. Will any gravel be processed on the site? <br />5. To what depth will the gravel he mined? <br />F. Will the mining operation stop befcre reaching the water <br />table? <br />C. Exhibit E _ Reclamation Plan <br />1. 4Rtat is the grass seed mix and the amounts to be planted? <br />Z. New slopes should be nd steeper than 2:1 (2 horizontal - <br />1 vertical) for dry pits. <br />3. Tqo what depth will the overburden and topsoil be replaced? <br />4. A soil analysis should be done to determine if any <br />fertilizer needs to be added. <br />5. Are any trees and shrubs going to be planted? <br />D. Exhibit J - Vegetation Information. <br />1. FThat is the estimated carrying capacity for the rangeland <br />bordering the site? <br />