Laserfiche WebLink
r~~CE~~p~q~ <br />Reclamation Cost Estimate ~~~ ~-6~ns Exhibit E <br />The following reclamation cost estim~e.iob~~~ie~~~~osal that there will be no more <br />than 8.0 acres t disturbed at any one time. ~le mme working face will be graded to lhav when <br />mining ceases. Cut/fill activities will be necessary to bring working face to the desired slope. <br />The working face will also be pocketed with a track hoe during the cuUfill process. The table <br />below outlines the stages of the reclamation process. A dozer will be used to shape and grade <br />the staging area. The seed mix and the labor to broadcast the seed is also included in this <br />estimate. <br /> Stage Total <br /> Terrace Reclamation 3.0 AC. <br /> Revegetation 8.0 AC. <br /> Estimated Unit Costs for Reclamation Items: <br /> Unit Cost <br />1. Revegetation area includes grass seed and labor $900.00/AC. <br />2. High wall reclamation $135.00/hour <br />' Reclamation Cost <br />1. Revegetation, 8.0 acre @ $900>1.0/AC. $7,200.00 <br />' <br />2. High wall reclamation @135/hour * 80 hours $10,800.00 <br /> Net Total $18,000.00 <br />' 3. Indirect costs <br /> Mobilization $1431.00 <br />' Insurance, Bond, & Profit $756.00 <br />4. Administration Costs 954.00 <br />' Total Estimate $21,141.00 <br /> Recommended bond be set at $25,000.00 <br />NOATH CLEAR CREEK CONSTRUCTION MArERws MINE CORDILLEAAN COMPLIANCE SERVICES, INC <br />E05574 PAGE 110E 21 GRAND JIiNCTION,COLORADO <br />