My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48196
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:10 PM
Creation date
11/20/2007 1:29:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
SECTION 2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 2: Permits <br />• additional disturbance in the hay field of approximately 0.5 acres. All water conveyance devices <br />except the Purgatoire River bridge will be expanded to accommodate the wider road. The only <br />modification to the existing bridge will include new planking and guard rail as shown on Figure <br />2.06-1. Reclamation of the road will consist of returning i[ to its original width. The additional <br />width will be ripped, topsoil will be replaced and it will be seeded. <br />In addition, LCC will be constructing a railroad loadout and coal stockpiling area comprising <br />approximately 6 acres on the south side of the tracks at the mouth of Lorencito Canyon. The site <br />is currently an inactive hay field, sometimes flood irrigated by the Chacon Ditch. The loadout will <br />be constructed by placing clean fill up to the level of the railroad (approx. 6 ft) after removal and <br />stockpiling [he soils. Most of the irrigated field will be taken out of use while the loadout is in use; <br />however, the Chacon Ditch will be protected and maintained. <br />No water quality or material damage impacts to surface or ground waters are anticipated from <br />construction and use the loadout. The loadout will be built with designed clear water diversion <br />ditches and sediment control ditches and ponds as part of the Surface Water Management Plan. <br />Monitoring the essential hydrologic functions of this area are provided by the MWLC-1 alluvial <br />well and the surface water stations at LC-1 and PRGTY-2 per the plan in 2.05.6(3) of this <br />application. <br />The reclaimed haul road and loadout areas will be revegetated with grassland mix and hay, <br />• respectively, and productivity will be evaluated along with other measures of reclamation success <br />(Section 2.05.4). <br />~ ~,~.~ ~ <br />2.06-3b (revised 05/22/01) <br />
The URL can be used to link to this page
Your browser does not support the video tag.